In 1987, the Provo Power Company (P.P.C. Limited) acquired a 50-year exclusive license to generate and distribute electricity for Providenciales, North Caicos, and Middle Caicos, which expires in 2037. Sep. . Photovoltaic (solar) panels and some support equipment carry a 0% duty, unlike the normal 30% on most items imported into the islands. However, a 5% Customs Processing Fee (. . HurricanesHurricanes are the largest threat to the integrity and life of a solar array in the Turks and Caicos. Panels are commonly manufactured to. . The payback period will likely be between 8-12 years, although this depends on a number of factors. Due to decreasing global costs of solar components, and a lack of a Turks and Caico. . A number of factors affect the efficiency of solar panels across locations. For example, PV panels located at higher altitudes receive more solar radiation and thus produce more po. [pdf]
Solar-derived power is increasing in popularity, with many private installations visible throughout the country, especially on new Turks and Caicos villa projects. Several local companies specialize in both supply and installation of alternative energy systems. The FortisTCI electricity plant on Providenciales.
The Turks and Caicos Government and Fortis TCI are currently reviewing the electricity legislation to enable Turks and Caicos residents to use the solar power they produce to offset their power consumption (rather than sell everything back to Fortis at their pre-agreed rate).
We specialize in the following solar products: solar hot water, solar pool heating, solar pool pumps and solar photovoltaic. Fortis TCI is the main power utility in the Turks and Caicos Islands. It is a privately owned company and services all of the inhabited islands within the Turks and Caicos Island chain.
In the Turks and Caicos , all public electricity generation is run by Fortis TCI, a vertically integrated company that provides both power generation and distribution.
Fortis TCI announced in 2017 that 1 MW of solar capacity is scheduled to be installed in the islands via the utility company, which would include a 700 kW array on North Caicos and 300 kW throughout the other islands. These projects are ongoing. There are two approaches for persons wishing to install a solar array at their residence or business:
Separately, Atlantic Equipment and Power (AEP) acquired an exclusive license for South Caicos which is due to expire in 2036. For the Turks Islands of Grand Turk and Salt Cay, electricity generation was run by Turks and Caicos Utilities (TCU), a government-owned entity.