Let's face it – traditional foundation methods are about as exciting as watching concrete dry. But here's where the CS-Rammed Piling Ground Mounting System changes the game. Imagine trying to build a house of cards in an earthquake zone versus using LEGO blocks engineered for seismic stability. That's essentially the difference we're talking about when comparing conventional methods to this innovative piling solutio
Contact online >>
Let's face it – traditional foundation methods are about as exciting as watching concrete dry. But here's where the CS-Rammed Piling Ground Mounting System changes the game. Imagine trying to build a house of cards in an earthquake zone versus using LEGO blocks engineered for seismic stability. That's essentially the difference we're talking about when comparing conventional methods to this innovative piling solution.
Unlike its clunky predecessors, the CS system operates like a surgical instrument for soil stabilization. Here's what makes it revolutionary:
When a 200MW solar project in Arizona's Sonoran Desert hit a snag with shifting sands, contractors faced a dilemma: spend $2.3M on conventional concrete footings or try the new rammed piling ground mounting system. The results?
"It's like we discovered foundation cheat codes," the project manager quipped during our interview. The system's adaptive design handled sand density variations that would've required 15 different traditional solutions.
Remember the 2018 Shanghai Tower settlement fiasco? Modern engineering problems demand solutions that can handle:
The CS-Rammed system's secret sauce lies in its dynamic response capability. During testing in California's earthquake simulation lab, piles demonstrated 22% better energy dissipation than conventional systems while maintaining 0.08° maximum tilt – better than the Leaning Tower of Pisa on its best day.
You wouldn't expect an foundation system to win environmental awards, but here we are. The ground mounting system reduces:
A recent wind farm installation in Norway actually improved local soil stability for native flora – try getting that result with old-school auger cast piles!
The magic happens in three acts:
It's so efficient that crews recently completed a 500-pile installation for a data center in record time – finishing before the client's IT team could configure their servers!
Let's talk numbers. For a typical mid-rise development:
| Method | Cost per pile | Installation Time | Long-term Maintenance |
|---|---|---|---|
| Traditional Driven | $1,200 | 45 mins | High |
| Auger Cast | $950 | 60 mins | Moderate |
| CS-Rammed | $1,050 | 22 mins | Low |
While the per-unit cost appears higher than some methods, factor in speed and reduced equipment needs – you're looking at 18% lower total project costs on average. That's enough to make any CFO smile (or at least stop frowning).
Here's where it gets interesting. Most foundation systems follow the "install and forget" philosophy... until cracks appear. The CS piling system includes:
A bridge project in Florida used these features to repair hurricane damage in 72 hours – faster than the DOT could restripe the access roads!
With climate change rewriting the rules of geotechnical engineering, adaptability is key. The rammed piling ground mount system addresses:
It's not just about building for today, but creating infrastructure that can handle tomorrow's unknown challenges. After all, who predicted we'd need parking garages strong enough to support EV charging stations and solar canopies?

The following table shows the NEC grounding wire size recommendation. The higher the AWG number, the smaller the wire. Note also that these are the minimum wire sizes you can use. These are the smallest allowable for safe grounding, but if you can get a large wire, use it. If you are going to install a solar panel in your. . Grounding solar panels is necessary because: 1. It reduces built up charge, making your system less attractive to lightning. 2. If a charge builds or lightning hits, the discharge will go. . Drive an 8 foot long copper plated rod into the ground at least 8 feet deep. The dryer the land, the more ground rods you should use. Space the rods 10 feet apart. Use clamps and #6 AWG bare copper wire to secure the rods together.. . The solar panel metal frame, inverter frame, AC generator and the negative side of your solar system must all be grounded. If a wind generator is connected to your solar panel, it must be. [pdf]
Make sure the grounding wire is at least as thick as the largest conductor in your system. For example, if you have 10-gauge wire running from your panels to your inverter, the grounding wire should also be at least 10-gauge. The grounding system should be connected to a ground rod that is driven into the earth.
Therefore, you must ground solar with the right wire sizes. Article 690 of the NEC mandates that #8 AWG or #6 AWG are the smallest wires that can be used with grid tied solar panels and inverter systems, and for solar panel output circuits, #10 or #12 AWG are allowed.
The Grounding conductor of the PV array must be bonded with the building equipment ground. In addition, it is permitted to have additional grounding electrodes tied directly to the PV Grounding Conductor. Traditional: Daisy Chained Copper Wire between components. Grounding solar panel frames and mounts – Traditional Daisy Chain.
Key points from the NEC: The code requires all non-current-carrying metal parts of the solar PV system to be grounded. It specifies the minimum size of grounding conductors (more on this later). The NEC also outlines requirements for grounding electrodes (like ground rods) and how they should be installed.
Throughout this guide, we’ve covered the key aspects of solar panel grounding, from understanding regulatory requirements to avoiding common mistakes. Remember, the most crucial takeaway is to always use #6 AWG bare copper wire for outdoor grounding. This simple yet vital detail can make the difference between passing and failing an inspection.
PV grounding lugs allow bonding to grounding conductor without cutting it. 250.122 shown in Appendix A. However, you must use 125% of the PV Imax as a proxy for the OCPD size in the table. (PV Imax is 125% of Isc times the number of parallel strings.
Visit our Blog to read more articles
We are deeply committed to excellence in all our endeavors.
Since we maintain control over our products, our customers can be assured of nothing but the best quality at all times.